Our pick
Data-center licence8× RTX PRO 6000 Blackwell
96 GB of ECC memory per card and a data-center licence, eight to a standard GPU server.
- Memory
- 768 GB
- Power, est.
- 5.6 kW
- Server
- On quote
- Hosting
- Available
GPU servers
Pick a package or tell us what you want to run. We quote the complete server, ship it to the facility and have it online, ready to rent or to run your own work.
Packages
Prices come on a written quote: GPU and memory prices move week to week, and we only quote what a supplier will stand behind.
Our pick
Data-center licence96 GB of ECC memory per card and a data-center licence, eight to a standard GPU server.
8-GPU SXM
Data-center licenceNVLink-connected 8-GPU nodes for training and heavy inference. Hosting confirmed per order.
GeForce · 32 GB
GeForceCurrent-generation GeForce with 32 GB per card. No maker sells a 5090 slim enough for eight in a standard server, so it is built in an oversized case.
Entry
GeForceThe lowest way in. 24 GB per card, a proven card for inference, in a full 8-GPU server.
Newest generation
Data-center licenceBlackwell for the newest clusters. Needs a partner facility with the cooling for it; by quote.
Power figures are rough full-load estimates for planning; hosting is billed on the draw measured at the facility. H100, H200 and B200 servers need a facility with the power and cooling for them, so we confirm hosting for each order before you buy.
Our pick
What you get

Licences
RTX 4090 and 5090 are GeForce cards: the best price per GPU, but NVIDIA's driver licence for GeForce restricts data-center use. RTX PRO 6000, H100 and newer are licensed for data centers. You install and accept the drivers, so pick with your use in mind. We'll talk it through on the quote.
Already have GPUs?
Our build service puts your GPUs in a server at the facility, priced in writing before any work starts, with no setup fee on the servers we build.
We reply with a price for the server, the hosting and the agreement to sign online.